How much does foundation repair cost in Kenosha, WI?

Foundation pier installation in Kenosha, WI
$22,886
12 piers · typical range $12,714 – $38,143
Typical total$1,907 per pier$22,886
Range you should see in bidsthree bids on the same scope normally land inside this$12,714 – $38,143
Labor portion55% of the job — this is the part that moves by city$12,587
Material portion45% — bought at national prices$10,299
Cement Masons and Concrete Finishers pay near Kenoshaabout $32/hr · Kenosha, WI metro$66,550/yr
U.S. mean for the same tradeSOC 47-2051$60,050/yr
Versus the national pricetrade pay here runs +10.8% against the U.S. mean+$1,286
Short pour season111 freezing days a year in Kenosha. ACI 306 cold-weather protection — blankets, heated water, or waiting — is a real line item here, not boilerplate—

Notes

  • Where the number comes from. The national price for foundation pier installation is $1,800 per pier — foundation pier pricing published for 2026, $1,000–$3,000 per pier installed. Labor is about 55% of that. Cement Masons and Concrete Finishers near Kenosha, WI average $66,550 a year against a U.S. mean of $60,050 — a factor of 1.108 — so the labor half is scaled by that and the material half is not. Source: BLS OEWS May 2025 for the Kenosha, WI metro area, SOC 47-2051.
  • Why the city matters, not just the state. Trade pay moves inside a state as much as it does between states. Crews do not commute across a state to bid a job, and materials ship at national prices either way — so a metro wage is the honest input here and a state average quietly rounds four different cities into one number.
  • Short pour season. 111 freezing days a year in Kenosha. ACI 306 cold-weather protection — blankets, heated water, or waiting — is a real line item here, not boilerplate.
  • What is in the price: excavation at each location, the pier and bracket, driving or screwing to load-bearing strata, lifting or stabilising, backfill and cleanup.
  • What is not: drainage correction, interior crack and drywall repair after the lift, engineering reports, and any landscaping put back. These are the lines that turn a $22,886 quote into a $28,607 invoice, so ask about each one before signing.
  • Use this as a bid check, not a quote. It prices an average job in average condition. Difficult access, the state of what is being replaced, the season, and a crew booked out three months all move the real number, and none of them are in a per-unit average.

foundation pier installation in Kenosha, WI

$22,886 is the typical number, and three bids on the same scope normally land between $12,714 and $38,143.

That is $1,286 more than the same job priced at the national average.

Why the city changes the number

About 55% of this job is labor — $12,587 of the $22,886 above. Labor is the only part that moves locally; a bundle of material costs what it costs wherever it is nailed down.

Cement Masons and Concrete Finishers near Kenosha average $66,550 a year, against a U.S. mean of $60,050. That is a factor of 1.108, so the labor half is scaled by it and the material half is not.

Source: BLS OEWS May 2025 for the Kenosha, WI metro area, SOC 47-2051.

What the quote should include

Short pour season

The lines that turn a quote into an invoice

Ask about each of them before you sign. On a job this size they are the difference between $22,886 and something a quarter higher.

Use it as a bid check, not a quote

This prices an average job in average condition. Access, the state of what is being replaced, the season, and a crew booked out three months all move the real number, and none of them are in a national average.

If a bid lands outside $12,714 – $38,143, that is not automatically wrong — but it is the question worth asking out loud.